Hyperion Research Assesses the HPC and AI-Sci Market
HPC and AI Sci spending in the first half of 2026 A presentation prepared by Earl Joseph, Bob Sorensen, and Mark Nossokoff for the SC26 Hyperion Research breakfast provides an o...
By Hardware Team
HPC and AI-Sci spending in the first half of 2026
A presentation prepared by Earl Joseph, Bob Sorensen, and Mark Nossokoff for the SC26 Hyperion Research breakfast provides an overview of the high-performance computing (HPC) and AI for science markets during the first half of 2026. It also includes forecasts for spending on on-premises systems and cloud capacity used for simulation, modeling, and scientific AI workloads.
The chart's on-premises HPC and AI-Sci revenues are measured in millions of dollars. From January through June, spending increased 19.9 percent to $16.48 billion. By comparison, worldwide unit shipments of on-premises HPC and AI-Sci systems increased 4.4 percent from the first half of 2025.
The difference between revenue and unit growth reflects several factors: systems contain more nodes, the number of CPUs per system has increased slightly, and prices for CPUs, GPUs, DRAM, and flash have risen. HPC centers may also be purchasing systems that are one or two generations behind the latest CPU and GPU products to reduce capital costs. Grace-Hopper and Intel Xeon-Hopper systems continue to appear in current Top500 rankings, even though Grace-Blackwell systems have been available for two years. Newer GPUs remain scarce and expensive for many HPC centers.
Dell leads on-premises revenue
Hewlett Packard Enterprise has led on-premises HPC and AI-Sci installations for many years, following its acquisitions of SGI and Cray. In the first half of 2026, however, Dell became the revenue leader.
The vendor figures represent revenue rather than unit shipments. Dell's HPC and AI-Sci system sales increased 67.7 percent during the first half of 2026, reaching $3.93 billion. HPE's on-premises technical-computing revenue grew 1.1 percent to $3.44 billion.
The results may be connected to GPU allocations from Nvidia or AMD. Dell has received preferential treatment from Nvidia for AI systems during the past two years. Revenue alone does not show how many aggregate FP64 floating-point operations per second the two vendors delivered, so HPE could still lead Dell in total HPC and AI-Sci computing performance.
The vendors below Dell and HPE account for a much larger combined group. Dozens of OEMs and ODMs generated $9.12 billion in sales during the first half of 2026, an increase of 13.8 percent. Dell's size and growth significantly influenced the overall market average.
It is too early to determine whether Dell will retain the lead in the second half of 2026. The result is expected to become clearer at the ISC27 Hyperion Research breakfast in Hamburg in June 2027. One possibility is that HPE is selling more CPU-only systems for traditional HPC modeling and simulation, while Dell is receiving more GPU allocations and selling more accelerator-based systems for workloads beyond generative AI.
GPU installations in HPC and AI-Sci
The presentation also tracked changes in the installed GPU base from 2017 through 2025. If the growth rate from 2024 to 2025 continues through 2026, approximately 1.2 million GPU accelerators could be installed worldwide in HPC and AI-Sci systems by the end of the year.
That figure needs to be considered alongside the broader accelerator market. An estimated 18 million to 20 million GPUs shipped during the past six or seven years remain in service. The worldwide fleet may also include 13 million to 17 million custom AI XPUs.
Google is estimated to account for 9 million to 11 million TPUs. Amazon may have approximately 3 million Trainium chips and 1 million to 2 million Inferentia chips. Microsoft and Meta Platforms have hundreds of thousands of Maia and MTIA accelerators, respectively. Chinese custom XPUs are not considered significant in this estimate.
Against a total worldwide installed base of approximately 31 million to 37 million GPUs and XPUs, the estimated 1.2 million GPUs used in HPC and AI-Sci would represent roughly 3 percent to 4 percent.
HPC and AI-Sci spending totals several tens of billions of dollars annually when power and data center construction are included. AI training and inference together represent a market two to three orders of magnitude larger. AI, once a smaller extension of HPC, has expanded into a much larger market while continuing to draw on systems and architectural advances developed by the HPC sector.
Forecast for on-premises systems
Hyperion Research forecasts that the on-premises HPC and AI-Sci server market will triple during the decade ending in 2030. That represents substantial growth, although it is less rapid than the generative AI expansion of the past four years.
Large-scale supercomputers account for most on-premises sales. Divisional, departmental, and workgroup systems continue to represent roughly the same proportion of the market as they did five years ago, and they are expected to maintain a similar share through 2030.
According to Joseph, the broader HPC and AI-Sci market, including storage, middleware, applications, services, cloud computing, networking, and cloud storage capacity, will exceed $100 billion in 2030. On-premises system sales are forecast to reach $54 billion.
Cloud capacity for scientific workloads
HPC centers both purchase clusters and rent computing capacity from cloud providers.
North America currently accounts for more cloud spending on HPC and AI-Sci applications than the EMEA and Asia-Pacific regions. From 2022 through 2030, spending on cloud capacity for these applications is forecast to grow by nearly five times, reaching approximately $30 billion in 2030.
Combined infrastructure spending
Hyperion Research combines on-premises acquisitions and cloud rental spending in a single infrastructure forecast. In 2022, the combined total was slightly above $40 billion. By 2030, it is expected to increase approximately 3.4 times to $135 billion.
Cloud spending may appear smaller because on-premises spending generally represents equipment purchased for a five-year period. Comparing five years of cloud spending with one year's on-premises purchases produces a closer view of the cost of delivering a given amount of compute time. On that basis, on-premises spending may be somewhat higher than cloud spending.
Both categories also include price increases resulting from higher component costs, which are passed on to customers through system prices and cloud rental rates.
The relative cost of performing HPC and AI-Sci work on-premises or in the cloud remains dependent on workload and operating conditions. Many HPC centers use both models, and the forecasts indicate that this combined approach will continue.